Intel SR2400SYSD2 User Guide - Page 46

Removing the Large Hot-swap Air Baffle (Backplane Installed), Safety, Information

Page 46 highlights

Removing the Large Hot-swap Air Baffle (Backplane Installed) 1. Observe the safety and ESD precautions at the beginning of this book. See "Safety Information." 2. Power down the server and unplug all peripheral devices and the AC power cable or DC external source. 3. Remove the chassis cover. For instructions, see "Removing the Chassis Cover." 4. Important: Note how the cables are routed around and under the air baffle. You will need to re-route these cables when you re-install the baffle. 5. Pull up on the air baffle to remove it. See the figure below. You may need to remove or hold cables out of the way. 6. Return to the procedure that directed you to remove the large air baffle. TP01347 * Air baffle for AC model shown; air baffle for DC model differs. Figure 16. Removing the Large Hot-swap Air Baffle 22

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139

22
Removing the Large Hot-swap Air Baffle (Backplane Installed)
1.
Observe the safety and ESD precautions at the beginning of this book. See “
Safety
Information
.”
2.
Power down the server and unplug all peripheral devices and the AC power cable or DC
external source.
3.
Remove the chassis cover. For instructions, see “
Removing the Chassis Cover
.”
4.
Important:
Note how the cables are routed around and under the air baffle. You will need to
re-route these cables when you re-install the baffle.
5.
Pull up on the air baffle to remove it. See the figure below. You may need to remove or hold
cables out of the way.
6.
Return to the procedure that directed you to remove the large air baffle.
TP01347
* Air baffle for AC model shown; air baffle for DC model differs.
Figure 16.
Removing the Large Hot-swap Air Baffle