Toshiba M200-ST2002 Maintenance Manual - Page 237

Installing the Application switchboard/Power switchboard, LCD latch assembly

Page 237 highlights

4 Replacement Procedures latch assembly 4.20 Application switch board/Power switch board/LCD Installing the Application switchboard/Power switchboard The following describes the procedure for installing the Application switchboard/Power switchboard (See Figure 4-35 to 4-36.) 1. Connect the harness to the connector on the application switchboard. Install the application switchboard along the guide pin on the both side and secure it with the following screws. • M2×4Z BIND screw x1 2. Connect the harness to the connector on the power switchboard. Install the power switchboard along the guide pin on the both side and secure it with the following screws. • M2×4Z BIND screw x1 4.20.2 LCD latch assembly Removing the LCD latch assembly The following describes the procedure for removing the LCD latch assembly (See Figure 4-37.) 1. Remove the following screws securing the LCD latch assembly and remove the LCD latch assembly. • M2.5×4Z FLAT BIND screw x1 M2.5x4Z FLAT BIND LCD latch assembly Figure 4-37 Removing the LCD latch assem bly 4 -4 8 Portege M200 Maintenance Manual(960 -457)

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325

4
Replacement Procedures
4.20
Application switch board/Power switch board/LCD
latch assembly
4-48
Portege M200 Maintenance Manual (960 -457)
Installing the Application switchboard/Power switchboard
The following describes the procedure for installing the Application switchboard/Power
switchboard (See Figure 4-35 to 4-36.)
1.
Connect the harness to the connector on the application switchboard. Install the
application switchboard along the guide pin on the both side and secure it with the
following screws.
M2
×
4Z
BIND
screw
x1
2.
Connect the harness to the connector on the power switchboard. Install the power
switchboard along the guide pin on the both side and secure it with the following
screws.
M2
×
4Z
BIND
screw
x1
4.20.2
LCD latch assembly
Removing the LCD latch assembly
The following describes the procedure for removing the LCD latch assembly (See Figure
4-37.)
1.
Remove the following screws securing the LCD latch assembly and remove the
LCD latch assembly.
M2.5
×
4Z FLAT BIND
screw
x1
LCD latch assembly
M2.5x4Z
FLAT BIND
Figure 4-37
Removing the LCD latch assembly