Cisco 2950 Hardware Installation Guide - Page 113
C-1, Stripping the Ground Wire, Step 3
UPC - 746320454504
View all Cisco 2950 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 113 highlights
Appendix C Connecting to DC Power Figure C-1 Stripping the Ground Wire 0.5 in. (12.7 mm) ± 0.02 in. (0.5 mm) Grounding the Switch 60528 Insulation Wire lead Step 3 Slide the open end of the ground lug over the exposed area of the 6-gauge wire. Step 4 Using a Panduit crimping tool, crimp the ground lug to the 6-gauge wire. Figure C-2 Crimping the Ground Lug 60529 Step 5 Step 6 Use the two number-10-32 screws to attach the ground lug and wire assembly to the rear panel of the Catalyst 2950G-24-EI-DC switch or to the front panel of the Catalyst 2950ST-24 LRE 997 switch. Using a ratcheting torque screwdriver, torque each ground-lug screw to 15 lbf-in. (240 ounce-force inches [ozf-in.]). Figure C-3 shows how to torque the ground screws on a Catalyst 2950G-24-EI-DC switch. OL-6156-01 Catalyst 2950 Switch Hardware Installation Guide C-3