Cisco 2950 Hardware Installation Guide - Page 130

Gigabit Interface Converters, GigaStack GBIC modules - 24 ios

Page 130 highlights

Index GBIC module ports 2-10 illustrated 2-3 to 2-7 LEDs 2-13 to 2-15 LRE ports 2-9 SFP module ports 2-11 G GBIC modules cable lengths 3-4 cables 1000BASE-T B-3 1000BASE-X 3-35 CWDM 3-35 GigaStack B-4 connecting to 3-35 to 3-38 connectors 1000BASE-T B-3 1000BASE-X B-4 CWDM 3-35 GigaStack B-4 described 2-10 illustrated 1000BASE-T 3-22 1000BASE-X 3-22 GigaStack 3-23 module slots 2-4 to 2-5 installing 3-22 Gigabit Interface Converters See GBIC modules GigaStack GBIC modules cable lengths 3-5 connecting to 3-37 connectors and cables B-4 described 2-10 illustrated 3-23 installing 3-22 ground connection warning C-2 grounded equipment warning 3-3, C-2 IN-4 Catalyst 2950 Switch Hardware Installation Guide H HP OpenView 2-24 humidity A-1 to A-4 I installation assigning the IP Address D-5 cable guide 3-16 connecting to a power source D-5 connecting to LRE ports 3-30 to 3-34 desk-mount 3-17 guidelines 3-4 mounting on a wall 3-18 to 3-19 package contents 3-5 to 3-6 pre-installation information and guidelines 3-1 to 3-3 rack-mount 3-7 to 3-16 shelf-mount 3-17 site requirements 2-11 starting the terminal-emulation software D-4 table-mount 3-17 wall-mount 3-17 to 3-19 installing GBIC modules 3-22 to 3-23 installing SFP modules 3-23 to 3-25 IOS command-line interface See CLI IP address procedures 3-40 L LEDs color meanings 2-17 to 2-18 duplex (DUPLX) 2-17 to 2-18 front panel 2-13 to 2-15 full-duplex 2-17 to 2-18 half-duplex 2-17 to 2-18 interpreting 2-17 to 2-18 LRE 2-17, 2-18 OL-6156-01

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134

Index
IN-4
Catalyst 2950 Switch Hardware Installation Guide
OL-6156-01
GBIC module ports
2-10
illustrated
2-3 to 2-7
LEDs
2-13 to 2-15
LRE ports
2-9
SFP module ports
2-11
G
GBIC modules
cable lengths
3-4
cables
1000BASE-T
B-3
1000BASE-X
3-35
CWDM
3-35
GigaStack
B-4
connecting to
3-35 to 3-38
connectors
1000BASE-T
B-3
1000BASE-X
B-4
CWDM
3-35
GigaStack
B-4
described
2-10
illustrated
1000BASE-T
3-22
1000BASE-X
3-22
GigaStack
3-23
module slots
2-4 to 2-5
installing
3-22
Gigabit Interface Converters
See GBIC modules
GigaStack GBIC modules
cable lengths
3-5
connecting to
3-37
connectors and cables
B-4
described
2-10
illustrated
3-23
installing
3-22
ground connection warning
C-2
grounded equipment warning
3-3, C-2
H
HP OpenView
2-24
humidity
A-1 to A-4
I
installation
assigning the IP Address
D-5
cable guide
3-16
connecting to a power source
D-5
connecting to LRE ports
3-30 to 3-34
desk-mount
3-17
guidelines
3-4
mounting on a wall
3-18 to 3-19
package contents
3-5 to 3-6
pre-installation information and guidelines
3-1 to 3-3
rack-mount
3-7 to 3-16
shelf-mount
3-17
site requirements
2-11
starting the terminal-emulation software
D-4
table-mount
3-17
wall-mount
3-17 to 3-19
installing GBIC modules
3-22 to 3-23
installing SFP modules
3-23 to 3-25
IOS command-line interface
See CLI
IP address procedures
3-40
L
LEDs
color meanings
2-17 to 2-18
duplex (DUPLX)
2-17 to 2-18
front panel
2-13 to 2-15
full-duplex
2-17 to 2-18
half-duplex
2-17 to 2-18
interpreting
2-17 to 2-18
LRE
2-17, 2-18