Cisco 2950 Hardware Installation Guide - Page 47

Installation, Preparing for Installation, Warnings

Page 47 highlights

Installation CH A P T E R 2 This chapter describes how to install your switch, interpret the power-on self-test (POST), and connect the switch to other devices. Read these topics, and perform the procedures in this order: • Preparing for Installation, page 2-1 • Verifying Switch Operation, page 2-6 • Installing the Switch, page 2-7 • Installing the GBIC Modules, page 2-22 • Installing and Removing SFP Modules, page 2-23 • Connecting to 10/100 and 10/100/1000 Ports, page 2-27 • Connecting to 100BASE-FX and 1000BASE-SX Ports, page 2-29 • Connecting to an LRE Port, page 2-30 • Connecting to GBIC Module Ports, page 2-35 • Connecting to SFP Modules, page 2-38 • Where to Go Next, page 2-40 Preparing for Installation This section provides information about these topics: • Warnings, page 2-1 • Installation Guidelines, page 2-4 • Verifying Package Contents, page 2-5 Warnings For translations of these warnings in several languages, see the Regulatory Compliance and Safety Information for the Catalyst 2950 Switch. Warning Attach only the Cisco Redundant Power Supply (RPS) (model PWR300-AC-RPS-N1) to the RPS receptacle. Statement 100B OL-6156-01 Catalyst 2950 Switch Hardware Installation Guide 2-1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134

CHAPTER
2-1
Catalyst 2950 Switch Hardware Installation Guide
OL-6156-01
2
Installation
This chapter describes how to install your switch, interpret the power-on self-test (POST), and connect
the switch to other devices. Read these topics, and perform the procedures in this order:
Preparing for Installation, page 2-1
Verifying Switch Operation, page 2-6
Installing the Switch, page 2-7
Installing the GBIC Modules, page 2-22
Installing and Removing SFP Modules, page 2-23
Connecting to 10/100 and 10/100/1000 Ports, page 2-27
Connecting to 100BASE-FX and 1000BASE-SX Ports, page 2-29
Connecting to an LRE Port, page 2-30
Connecting to GBIC Module Ports, page 2-35
Connecting to SFP Modules, page 2-38
Where to Go Next, page 2-40
Preparing for Installation
This section provides information about these topics:
Warnings, page 2-1
Installation Guidelines, page 2-4
Verifying Package Contents, page 2-5
Warnings
For translations of these warnings in several languages, see the
Regulatory Compliance and Safety
Information for the Catalyst 2950 Switch
.
Warning
Attach only the Cisco Redundant Power Supply (RPS) (model PWR300-AC-RPS-N1) to the RPS
receptacle.
Statement 100B