Dell PowerConnect J-SRX100 Hardware Guide - Page 34
Table 11: Site Preparation Checklist for Services Gateway, Installation
View all Dell PowerConnect J-SRX100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
PowerConnect J-SRX100 Services Gateway Hardware Guide Table 11: Site Preparation Checklist for Services Gateway Installation (continued) Item or Task Additional Information Performed By Date • Measure the distance between the external power sources and the device installation site. • Locate sites for connection of system grounding. • Calculate the power consumption and requirements. "J-SRX100 Services Gateway Site Electrical Wiring Guidelines" on page 123 "J-SRX100 Services Gateway Power Specifications and Requirements" on page 124 Rack Requirements Verify that your rack meets the minimum requirements. "J-SRX100 Services Gateway Rack Requirements" on page 23 Rack Installation • Plan the rack location, including required space clearances. • Secure the rack to the floor and building structure. "Preparing the J-SRX100 Services Gateway for Rack-Mount Installation" on page 37 Cabinet Requirements • Verify that your cabinet meets the minimum requirements. • Plan the cabinet location, including required space clearances. Wall Installation "J-SRX100 Services Gateway Cabinet Requirements" on page 22 Notes 20