Dell PowerConnect J-SRX100 Hardware Guide - Page 34

Table 11: Site Preparation Checklist for Services Gateway, Installation

Page 34 highlights

PowerConnect J-SRX100 Services Gateway Hardware Guide Table 11: Site Preparation Checklist for Services Gateway Installation (continued) Item or Task Additional Information Performed By Date • Measure the distance between the external power sources and the device installation site. • Locate sites for connection of system grounding. • Calculate the power consumption and requirements. "J-SRX100 Services Gateway Site Electrical Wiring Guidelines" on page 123 "J-SRX100 Services Gateway Power Specifications and Requirements" on page 124 Rack Requirements Verify that your rack meets the minimum requirements. "J-SRX100 Services Gateway Rack Requirements" on page 23 Rack Installation • Plan the rack location, including required space clearances. • Secure the rack to the floor and building structure. "Preparing the J-SRX100 Services Gateway for Rack-Mount Installation" on page 37 Cabinet Requirements • Verify that your cabinet meets the minimum requirements. • Plan the cabinet location, including required space clearances. Wall Installation "J-SRX100 Services Gateway Cabinet Requirements" on page 22 Notes 20

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158

Table 11: Site Preparation Checklist for Services Gateway
Installation
(continued)
Notes
Date
Performed By
Additional
Information
Item or Task
“J-SRX100
Services
Gateway Site
Electrical Wiring
Guidelines” on
page 123
“J-SRX100
Services
Gateway Power
Specifications
and
Requirements”
on page 124
Measure the distance
between the external
power sources and
the device installation
site.
Locate sites for
connection of system
grounding.
Calculate the power
consumption and
requirements.
Rack Requirements
“J-SRX100
Services
Gateway Rack
Requirements”
on page 23
Verify that your rack
meets the minimum
requirements.
Rack Installation
“Preparing the
J-SRX100
Services
Gateway for
Rack-Mount
Installation” on
page 37
Plan the rack location,
including required
space clearances.
Secure the rack to the
floor and building
structure.
Cabinet Requirements
“J-SRX100
Services
Gateway
Cabinet
Requirements”
on page 22
Verify that your
cabinet meets the
minimum
requirements.
Plan the cabinet
location, including
required space
clearances.
Wall Installation
20
PowerConnect J-SRX100 Services Gateway Hardware Guide