Dell PowerConnect J-SRX100 Hardware Guide - Page 35
continued, General Site Guidelines for Installing the J-SRX100 Services Gateway - review
View all Dell PowerConnect J-SRX100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Chapter 3: Preparing the Site for J-SRX100 Services Gateway Installation Table 11: Site Preparation Checklist for Services Gateway Installation (continued) Item or Task Additional Information Performed By Date • Verify that the area selected meets the minimum requirements. • Verify that you have the required hardware to proceed with the installation. "Preparing the J-SRX100 Services Gateway for Wall-Mount Installation" on page 38 Desktop Installation • Verify that the area selected meets the minimum requirements. • Plan the installation location, including required space clearances and airflow requirements. "Preparing the J-SRX100 Services Gateway for Desk-Mount Installation" on page 38 Cables • Acquire cables and connectors. • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected. • Plan the cable routing and management. "Interface Cable and Wire Specifications for the J-SRX100 Services Gateway" on page 127 Notes Related • J-SRX100 Services Gateway Specifications on page 7 Documentation • J-SRX100 Services Gateway Safety Requirements, Warnings, and Guidelines on page 41 • Installation Overview for the J-SRX100 Services Gateway on page 28 • General Site Guidelines for Installing the J-SRX100 Services Gateway on page 22 • J-SRX100 Services Gateway Cabinet Requirements on page 22 • J-SRX100 Services Gateway Rack Requirements on page 23 • Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX100 Services Gateway on page 24 21