Dell PowerEdge T430 Dell PowerEdge T430 Owners Manual - Page 121

Removing the power supply unit blank

Page 121 highlights

Steps Slide the new power supply unit into the chassis until the power supply unit is fully seated and the release latch snaps into place. NOTE: If you unlatched the cable management arm, re-latch it. For information about the cable management arm, see the system's rack documentation. Next steps 1. Connect the power cable to the power supply unit and plug the cable into a power outlet. CAUTION: When connecting the power cable, secure the cable with the strap. NOTE: When installing, hot-swapping, or hot-adding a new power supply unit, wait for 15 seconds for the system to recognize the power supply unit and determine its status. The power supply redundancy may not occur until discovery is complete. Wait until the new power supply unit is discovered and enabled before you remove the other power supply unit. The powersupply unit status indicator turns green to signify that the power supply unit is functioning properly. Related Links Removing the power supply unit blank Removing a redundant AC power supply Removing the power supply unit blank If you are installing a second power supply unit, remove the power supply unit blank in the bay by pulling the blank outward. CAUTION: To ensure proper system cooling, the power supply blank must be installed in the second power supply bay in a non-redundant configuration. Remove the power supply blank only if you are installing a second power supply. 121

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179

Steps
Slide the new power supply unit into the chassis until the power supply unit is fully seated and the
release latch snaps into place.
NOTE:
If you unlatched the cable management arm, re-latch it. For information about the cable
management arm, see the system’s rack documentation.
Next steps
1.
Connect the power cable to the power supply unit and plug the cable into a power outlet.
CAUTION: When connecting the power cable, secure the cable with the strap.
NOTE:
When installing, hot-swapping, or hot-adding a new power supply unit, wait for 15
seconds for the system to recognize the power supply unit and determine its status. The power
supply redundancy may not occur until discovery is complete. Wait until the new power supply
unit is discovered and enabled before you remove the other power supply unit. The power-
supply unit status indicator turns green to signify that the power supply unit is functioning
properly.
Related Links
Removing the power supply unit blank
Removing a redundant AC power supply
Removing the power supply unit blank
If you are installing a second power supply unit, remove the power supply unit blank in the bay by
pulling the blank outward.
CAUTION: To ensure proper system cooling, the power supply blank must be installed in the
second power supply bay in a non-redundant configuration. Remove the power supply blank
only if you are installing a second power supply.
121