Netgear GS728TPP GS728TP/GS728TPP/GS752TP Software Administration Manual - Page 217
Cable Test, Request/ID Frames Transmitted
View all Netgear GS728TPP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 217 highlights
GS752TP, GS728TP, and GS728TPP Gigabit Smart Switches • Length Error Frames Received. The number of EAPOL frames with an invalid packet body length received on this port. • Response/ID Frames Received. The number of EAP respond ID frames that have been received on the port. • Response Frames Received. The number of valid EAP response frames received on the port. • Request/ID Frames Transmitted. The number of EAP requested ID frames transmitted through the port. • Request Frames Transmitted. The number of EAP request frames transmitted through the port. Use the buttons at the bottom of the screen to perform the following actions: • To clear all the EAP counters for all ports on the switch, select the check box in the row heading and click CLEAR. The button resets all statistics for all ports to 0. • To clear the counters for a specific port, select the check box associated with the port and click CLEAR. Cable Test Use the Cable Test screen to display information about the cables connected to switch ports. To display cable information: 1. Select Monitoring Ports Cable Test. The following screen displays: 2. Select the interface for which cable data is to be displayed. Monitoring the System 217