HP 6125G HP 6125G & 6125G/XG Blade Switches Network Management and Mon - Page 124
Configuring a schedule for an NQA test group, Configuration prerequisites
View all HP 6125G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 124 highlights
Step Command 5. Configure the interval between two consecutive tests for a test group. frequency interval 6. Configure the number of probe operations to be performed in probe count times one test. 7. Configure the NQA probe timeout time. probe timeout timeout 8. Configure the maximum number of hops a probe packet traverses ttl value in the network. 9. Configure the ToS field in an IP packet header in an NQA tos value probe packet. 10. Enable the routing table bypass route-option function. bypass-route Remarks Optional. By default, the interval between two consecutive tests for a test group is 0 milliseconds. Only one test is performed. If the last test is not completed when the interval specified by the frequency command is reached, a new test does not start. Optional. By default, one probe operation is performed in one test. Not available for voice tests, Only one probe operation can be performed in one voice test. Optional. By default, the timeout time is 3000 milliseconds. Not available for UDP jitter tests. Optional. 20 by default. Not available for DHCP tests. Optional. 0 by default. Optional. Disabled by default. Not available for DHCP tests. Configuring a schedule for an NQA test group You can configure a schedule for an NQA test group by setting the start time and test duration for a test group. A test group performs tests between the scheduled start time and the end time (the start time plus test duration). If the scheduled start time is ahead of the system time, the test group starts testing immediately. If both the scheduled start and end time are behind the system time, no test will start. To view the current system time, use the display clock command. Configuration prerequisites Before you configure a schedule for an NQA test group, complete the following tasks: • Configure test parameters required for the test type. • Configure the NQA server for tests that require cooperation with the NQA server. 117