Power On/Off LED 2 turns from green to amber indicating standby mode.

Page 22 highlights

Installing Hardware Options To access internal components: 1. Power down the server. a. Shut down the operating system as directed in the operating system instructions. CAUTION: Whenever installing hardware or performing maintenance procedures requiring access to internal components, it is recommended that all server data be backed up to avoid loss. b. Press the unit identification button on the server front panel (1). An LED illuminates blue on the server front and rear panels. c. Press the server Power On/Standby button (2) to power down the server. The Power On/Off LED (2) turns from green to amber indicating standby mode. Figure 2-1: Activating the front unit identification LED and powering down the server 2. If the server has a sliding rail solution: a. Loosen the thumbscrews securing the server in the rack. b. Slide the server out of the rack until the rail locks engage. c. Disconnect the power cord. HP ProLiant DL360 Generation 3 Server Setup and Installation Guide 2-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

Installing Hardware Options
HP ProLiant DL360 Generation 3 Server Setup and Installation Guide
2-3
To access internal components:
1.
Power down the server.
a.
Shut down the operating system as directed in the operating system
instructions.
CAUTION:
Whenever installing hardware or performing maintenance
procedures requiring access to internal components, it is recommended that all
server data be backed up to avoid loss.
b.
Press the unit identification button on the server front panel (1). An LED
illuminates blue on the server front and rear panels.
c.
Press the server Power On/Standby button (2) to power down the server. The
Power On/Off LED (2) turns from green to amber indicating standby mode.
Figure 2-1:
Activating the front unit identification LED
and powering down the server
2.
If the server has a sliding rail solution:
a.
Loosen the thumbscrews securing the server in the rack.
b.
Slide the server out of the rack until the rail locks engage.
c.
Disconnect the power cord.