HP DL360 HP ProLiant DL360 Generation 3 Server Setup and Installation Guide - Page 46

Server Installation, Server Installation Procedures, Measuring with the Template

Page 46 highlights

3 Server Installation Server Installation Procedures To install the rack-mounted server into a Compaq branded rack, complete the procedures described in the following subsections. Measuring with the Template IMPORTANT: Determine the server's place in the rack before starting installation of the universal rack rails. Refer to the Rack Builder report that was printed during planning of the rack configuration. IMPORTANT: The template is two-sided (front and back) and printed with arrows that show where items will be inserted, both for the universal rack rails and for the thumbscrews that secure the server faceplate to the front of the rack. HP ProLiant DL360 Generation 3 Server Setup and Installation Guide 3-1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

HP ProLiant DL360 Generation 3 Server Setup and Installation Guide
3-1
3
Server Installation
Server Installation Procedures
To install the rack-mounted server into a Compaq branded rack, complete the
procedures described in the following subsections.
Measuring with the Template
IMPORTANT:
Determine the server’s place in the rack
before
starting installation of the
universal rack rails. Refer to the Rack Builder report that was printed during planning of the
rack configuration.
IMPORTANT:
The template is two-sided (front and back) and printed with arrows that show
where items will be inserted, both for the universal rack rails and for the thumbscrews that
secure the server faceplate to the front of the rack.