HP DL360 HP ProLiant DL360 Generation 3 Server Setup and Installation Guide - Page 57

Powering Up the Server, to Server Configuration and Utilities.

Page 57 highlights

Server Installation 5. Route the cables to the side of the rack. 6. Route all cables for all servers in the rack. Refer to Figure 3-10 Figure 3-10: Properly routed cabling for multiple servers installed in a Compaq branded rack Powering Up the Server The server is ready to be powered up after connecting the cables to the server and installing it in the rack. To power up the server: 1. Press the Power On/Off switch. 2. Confirm a successful power-on sequence by ensuring that the Power On/Off LED is illuminated green or amber. Refer to Appendix E, "LEDs, Switches, and Jumpers." After the server has successfully powered up, begin the configuration process. Refer to Chapter 4, "Server Configuration and Utilities." If the server does not power up successfully, or if it indicates a fault, refer to Appendix D, "Troubleshooting." 3-12 HP ProLiant DL360 Generation 3 Server Setup and Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

Server Installation
3-12
HP ProLiant DL360 Generation 3 Server Setup and Installation Guide
5.
Route the cables to the side of the rack.
6.
Route all cables for all servers in the rack. Refer to Figure 3-10
Figure 3-10:
Properly routed cabling for multiple
servers installed in a Compaq branded rack
Powering Up the Server
The server is ready to be powered up after connecting the cables to the server and
installing it in the rack.
To power up the server:
1.
Press the Power On/Off switch.
2.
Confirm a successful power-on sequence by ensuring that the Power On/Off
LED is illuminated green or amber. Refer to Appendix E, “LEDs, Switches, and
Jumpers.”
After the server has successfully powered up, begin the configuration process. Refer
to Chapter 4, “Server Configuration and Utilities.”
If the server does not power up successfully, or if it indicates a fault, refer to
Appendix D, “Troubleshooting.”