Dell PowerConnect J-8208 Hardware Guide - Page 73
Site Preparation, Site Preparation Checklist for a J-EX8200 Switch
View all Dell PowerConnect J-8208 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 73 highlights
CHAPTER 4 Site Preparation • Site Preparation Checklist for a J-EX8200 Switch on page 57 • General Site Guidelines for J-EX Series Switches on page 58 • Site Electrical Wiring Guidelines for J-EX Series Switches on page 59 • Environmental Requirements and Specifications for J-EX Series Switches on page 60 Site Preparation Checklist for a J-EX8200 Switch The checklist in Table 27 on page 57 summarizes the tasks you need to perform to prepare a site for installing a J-EX8200 switch. Table 27: Site Preparation Checklist Item or Task For More Information Performed By Date Environment Verify that environmental factors such as temperature and humidity do not exceed switch tolerances. "Environmental Requirements and Specifications for J-EX Series Switches" on page 60 Power Measure distance between external power sources and switch installation site. Calculate the power consumption and requirements. "AC Power Specifications for J-EX8200 Switches" on page 75 "Power Requirements for J-EX8208 Switch Components" on page 76 "Calculating Power Requirements for a J-EX8208 Switch" on page 79 "Calculating the J-EX8200 Switch Fiber-Optic Cable Power Budget" on page 84 "Calculating the J-EX8200 Switch Fiber-Optic Cable Power Margin" on page 85 57