HP 9000 rp4410-4 User Service Guide, Fifth Edition - HP 9000 rp4410/4440 - Page 55

Safety Information, Installation Sequence and Checklist

Page 55 highlights

Safety Information Use care to prevent injury and equipment damage when performing removal and replacement procedures. Voltages might be present within the server. Many assemblies are sensitive to damage by electrostatic discharge. To ensure safe handling of components, prevent injury, and prevent damage to the server, follow the safety conventions listed below: • When removing or installing any server component, follow the instructions provided in this guide. • If installing a hot-swappable or hot-pluggable component when power is applied (fans are running), reinstall the server cover immediately to prevent overheating. • If installing a hot-pluggable component, complete the required software intervention before removing the component. • If installing an assembly that is neither hot-swappable nor hot-pluggable, disconnect the power cable from the external server power receptacle before proceeding. WARNING! Ensure that the system is powered off and all power sources are disconnected from the server before removing or installing server hardware unless you are removing or installing a hot-swappable or hot-pluggable component. Voltages are present at various locations within the server whenever a dc power source is connected. This voltage is present even when the main power switch is turned off. Failure to observe this warning can result in personal injury or damage to equipment. • Do not wear loose clothing that can snag or catch on the server or on other items. • Do not wear clothing subject to static charge build up, such as wool or synthetic materials. • If installing an internal assembly, wear an antistatic wrist strap and use a grounding mat, such as those included in the Electrically Conductive Field Service Grounding Kit (HP 9300-1609). • Handle accessory boards and components by the edges only. Do not touch any metal-edge connectors or any electrical components on accessory boards. Installation Sequence and Checklist To ensure successful installation of the server, follow the steps in Table 3-2 sequentially. Table 3-2 Installation Sequence Checklist Step Description Completed 1 Unpack and inspect the server shipping container. Inventory the contents using the packing slip. 2 Install additional components shipped with the server. 3 Install the server into a rack or pedestal mount. 4 Connect cables to the server. 4a Connect DC input power cable. 4b Connect the LAN core I/O cable. 5 Set up the console. 6 Power on the server. 7 Access the console. Safety Information 55

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246

Safety Information
Use care to prevent injury and equipment damage when performing removal and replacement
procedures. Voltages might be present within the server. Many assemblies are sensitive to damage
by electrostatic discharge.
To ensure safe handling of components, prevent injury, and prevent damage to the server, follow
the safety conventions listed below:
When removing or installing any server component, follow the instructions provided in this
guide.
If installing a hot-swappable or hot-pluggable component when power is applied (fans are
running), reinstall the server cover immediately to prevent overheating.
If installing a hot-pluggable component, complete the required software intervention before
removing the component.
If installing an assembly that is neither hot-swappable nor hot-pluggable, disconnect the
power cable from the external server power receptacle before proceeding.
WARNING!
Ensure that the system is powered off and all power sources are disconnected
from the server before removing or installing server hardware unless you are removing or
installing a hot-swappable or hot-pluggable component.
Voltages are present at various locations within the server whenever a dc power source is
connected. This voltage is present even when the main power switch is turned off.
Failure to observe this warning can result in personal injury or damage to equipment.
Do not wear loose clothing that can snag or catch on the server or on other items.
Do not wear clothing subject to static charge build up, such as wool or synthetic materials.
If installing an internal assembly, wear an antistatic wrist strap and use a grounding mat,
such as those included in the Electrically Conductive Field Service Grounding Kit (HP
9300-1609).
Handle accessory boards and components by the edges only. Do not touch any metal-edge
connectors or any electrical components on accessory boards.
Installation Sequence and Checklist
To ensure successful installation of the server, follow the steps in
Table 3-2
sequentially.
Table 3-2 Installation Sequence Checklist
Completed
Description
Step
Unpack and inspect the server shipping container. Inventory the contents using the
packing slip.
1
Install additional components shipped with the server.
2
Install the server into a rack or pedestal mount.
3
Connect cables to the server.
4
Connect DC input power cable.
4a
Connect the LAN core I/O cable.
4b
Set up the console.
5
Power on the server.
6
Access the console.
7
Safety Information
55