IBM x3655 Service Guide - Page 113

disconnected

Page 113 highlights

To install the replacement system board and shuttle, complete the following steps: Shuttle release latch Shuttle assembly 1. Align the openings in the sides of the shuttle with the protrusions in the sides of the server, and lower the shuttle into the server; then, slide the shuttle toward the front of the server until it clicks into place. Make sure that the shuttle locking latch holds the shuttle securely in place. 2. Slide the power backplane toward the system board until the connectors mate (see "Installing the power backplane" on page 83). 3. Install the power supplies (see "Installing a hot-swap power supply" on page 69). 4. Connect the cables to the system board that you disconnected in step 7 of "Removing the system board and shuttle" on page 93. 5. Install each microprocessor with its heat sink (see "Installing a microprocessor" on page 88). 6. Install the DIMMs (see "Installing a memory module" on page 62). 7. Install the air baffles. 8. Install the riser-card assembly and all adapters. 9. Install the fan-bracket assembly. 10. Install the server cover (see Installing the cover). 11. Slide the server into the rack. 12. Connect the cables and power cords. 13. Turn on all attached devices and the server. Chapter 3. Removing and replacing server components 95

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212

To
install
the
replacement
system
board
and
shuttle,
complete
the
following
steps:
Shuttle release
latch
Shuttle assembly
1.
Align
the
openings
in
the
sides
of
the
shuttle
with
the
protrusions
in
the
sides
of
the
server,
and
lower
the
shuttle
into
the
server;
then,
slide
the
shuttle
toward
the
front
of
the
server
until
it
clicks
into
place.
Make
sure
that
the
shuttle
locking
latch
holds
the
shuttle
securely
in
place.
2.
Slide
the
power
backplane
toward
the
system
board
until
the
connectors
mate
(see
“Installing
the
power
backplane”
on
page
83).
3.
Install
the
power
supplies
(see
“Installing
a
hot-swap
power
supply”
on
page
69).
4.
Connect
the
cables
to
the
system
board
that
you
disconnected
in
step
7
of
“Removing
the
system
board
and
shuttle”
on
page
93.
5.
Install
each
microprocessor
with
its
heat
sink
(see
“Installing
a
microprocessor”
on
page
88).
6.
Install
the
DIMMs
(see
“Installing
a
memory
module”
on
page
62).
7.
Install
the
air
baffles.
8.
Install
the
riser-card
assembly
and
all
adapters.
9.
Install
the
fan-bracket
assembly.
10.
Install
the
server
cover
(see
Installing
the
cover).
11.
Slide
the
server
into
the
rack.
12.
Connect
the
cables
and
power
cords.
13.
Turn
on
all
attached
devices
and
the
server.
Chapter
3.
Removing
and
replacing
server
components
95