IBM x3655 Service Guide - Page 91

Removing, replacing

Page 91 highlights

3. Install any adapters you removed. 4. Connect the internal cables that you disconnected. 5. Install the air baffle (see "Installing the air baffle" on page 42). 6. Install the riser-card assembly "Installing the riser-card assembly" on page 85. 7. Install the cover (see "Installing the cover" on page 40). 8. Slide the server into the rack. 9. Connect the cables and power cords. Note: You must wait approximately 20 seconds after you connect the power cord of the server to an electrical outlet before the power-control button becomes active. 10. Turn on all attached devices and the server. 11. Start the Configuration/Setup Utility program and reset the configuration. v Set the system date and time. v Set the power-on password. v Reconfigure the server. See "Using the Configuration/Setup Utility program" on page 18 for details. Removing and replacing Tier 2 CRUs You may install a Tier 2 CRU yourself or request IBM to install it, at no additional charge, under the type of warranty service that is designated for your server. The illustrations in this document might differ slightly from your hardware. Chapter 3. Removing and replacing server components 73

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212

3.
Install
any
adapters
you
removed.
4.
Connect
the
internal
cables
that
you
disconnected.
5.
Install
the
air
baffle
(see
“Installing
the
air
baffle”
on
page
42).
6.
Install
the
riser-card
assembly
“Installing
the
riser-card
assembly”
on
page
85.
7.
Install
the
cover
(see
“Installing
the
cover”
on
page
40).
8.
Slide
the
server
into
the
rack.
9.
Connect
the
cables
and
power
cords.
Note:
You
must
wait
approximately
20
seconds
after
you
connect
the
power
cord
of
the
server
to
an
electrical
outlet
before
the
power-control
button
becomes
active.
10.
Turn
on
all
attached
devices
and
the
server.
11.
Start
the
Configuration/Setup
Utility
program
and
reset
the
configuration.
v
Set
the
system
date
and
time.
v
Set
the
power-on
password.
v
Reconfigure
the
server.
See
“Using
the
Configuration/Setup
Utility
program”
on
page
18
for
details.
Removing
and
replacing
Tier
2
CRUs
You
may
install
a
Tier
2
CRU
yourself
or
request
IBM
to
install
it,
at
no
additional
charge,
under
the
type
of
warranty
service
that
is
designated
for
your
server.
The
illustrations
in
this
document
might
differ
slightly
from
your
hardware.
Chapter
3.
Removing
and
replacing
server
components
73