IBM x3655 Service Guide - Page 91
Removing, replacing
UPC - 883436014533
View all IBM x3655 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 91 highlights
3. Install any adapters you removed. 4. Connect the internal cables that you disconnected. 5. Install the air baffle (see "Installing the air baffle" on page 42). 6. Install the riser-card assembly "Installing the riser-card assembly" on page 85. 7. Install the cover (see "Installing the cover" on page 40). 8. Slide the server into the rack. 9. Connect the cables and power cords. Note: You must wait approximately 20 seconds after you connect the power cord of the server to an electrical outlet before the power-control button becomes active. 10. Turn on all attached devices and the server. 11. Start the Configuration/Setup Utility program and reset the configuration. v Set the system date and time. v Set the power-on password. v Reconfigure the server. See "Using the Configuration/Setup Utility program" on page 18 for details. Removing and replacing Tier 2 CRUs You may install a Tier 2 CRU yourself or request IBM to install it, at no additional charge, under the type of warranty service that is designated for your server. The illustrations in this document might differ slightly from your hardware. Chapter 3. Removing and replacing server components 73