IBM x3655 Service Guide - Page 68

Removing, ServeRAID, controller

Page 68 highlights

3. Rotate the free end of the adapter down under the tabs and onto the pins on the retainer brackets; then, press the adapter into the connector on the riser card and make sure that all the tabs on the latch brackets secure the adapter in place. 4. Replace the riser-card assembly (see "Installing the riser-card assembly" on page 85) 5. Install the cover (see "Installing the cover" on page 40). 6. Slide the server into the rack. 7. Connect the cables and power cords. 8. Turn on all attached devices and the server. 9. Restore the backup copy of the configuration to the Remote Supervisor Adapter II SlimLine. If you do not have a backup copy of the configuration, see the documentation that comes with the Remote Supervisor Adapter II SlimLine for information about installing the firmware and configuring the options. Note: When you start the server for the first time after you install a Remote Supervisor Adapter II SlimLine, the start-up process will take several minutes longer than a typical start-up. Removing the ServeRAID SAS controller Attention: To avoid breaking the retaining clips or damaging the connectors, handle the clips gently. Note: The following illustration shows removing a ServeRAID-8k SAS controller; the ServeRAID-8k-l SAS controller does not have a battery. Battery cable Battery RAID controller Battery mounting tabs Battery mounting clips Battery cable connector To remove the ServeRAID SAS controller, complete the following steps: 1. Read the safety information that begins on page vii and "Installation guidelines" on page 35. 50 IBM System x3655 Type 7985: Problem Determination and Service Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212

3.
Rotate
the
free
end
of
the
adapter
down
under
the
tabs
and
onto
the
pins
on
the
retainer
brackets;
then,
press
the
adapter
into
the
connector
on
the
riser
card
and
make
sure
that
all
the
tabs
on
the
latch
brackets
secure
the
adapter
in
place.
4.
Replace
the
riser-card
assembly
(see
“Installing
the
riser-card
assembly”
on
page
85)
5.
Install
the
cover
(see
“Installing
the
cover”
on
page
40).
6.
Slide
the
server
into
the
rack.
7.
Connect
the
cables
and
power
cords.
8.
Turn
on
all
attached
devices
and
the
server.
9.
Restore
the
backup
copy
of
the
configuration
to
the
Remote
Supervisor
Adapter
II
SlimLine.
If
you
do
not
have
a
backup
copy
of
the
configuration,
see
the
documentation
that
comes
with
the
Remote
Supervisor
Adapter
II
SlimLine
for
information
about
installing
the
firmware
and
configuring
the
options.
Note:
When
you
start
the
server
for
the
first
time
after
you
install
a
Remote
Supervisor
Adapter
II
SlimLine,
the
start-up
process
will
take
several
minutes
longer
than
a
typical
start-up.
Removing
the
ServeRAID
SAS
controller
Attention:
To
avoid
breaking
the
retaining
clips
or
damaging
the
connectors,
handle
the
clips
gently.
Note:
The
following
illustration
shows
removing
a
ServeRAID-8k
SAS
controller;
the
ServeRAID-8k-l
SAS
controller
does
not
have
a
battery.
Battery
RAID controller
Battery mounting
clips
Battery mounting
tabs
Battery cable
Battery cable
connector
To
remove
the
ServeRAID
SAS
controller,
complete
the
following
steps:
1.
Read
the
safety
information
that
begins
on
page
vii
and
“Installation
guidelines”
on
page
35.
50
IBM
System
x3655
Type
7985:
Problem
Determination
and
Service
Guide