IBM x3655 Service Guide - Page 83
Installing, hot-swap
![]() |
UPC - 883436014533
View all IBM x3655 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 83 highlights
Hot-swap fan 1. Read the safety information that begins on page vii and "Installation guidelines" on page 35. 2. Slide the server out of the rack and remove the cover (see "Removing the cover" on page 39). The LED on the failing fan will be lit. Attention: To ensure proper cooling and airflow, do not operate the server for more than 2 minutes with the top cover removed. 3. Remove the failed fan from the server: a. Place your fingers into the two handles on the top of the failing fan. b. Press the handles together and lift the fan out of the server. 4. If you are instructed to return the fan, follow all packaging instructions, and use any packaging materials for shipping that are supplied to you. Installing a hot-swap fan For proper cooling, the server requires five fans installed for each hot-swap power supply installed. The server comes with five replaceable fans. If you install a second hot-swap power supply, you must install the complete set of five fans that come with the power-supply option. Important: Only the configurations shown in the following table are supported: Installed power supplies Power supply 1 Power supplies 1 and 2 Required fans Fans in locations 3, 4, 8, 9, and 10 All 10 fans Attention: To ensure proper server operation, if a fan fails, replace it as soon as possible. To install any of the 10 replaceable fans, complete the following steps. Chapter 3. Removing and replacing server components 65
![](/manual_guide/products/ibm-x3655-service-guide-079be7e/83.png)