IBM x3655 Service Guide - Page 79
fan-bracket
![]() |
UPC - 883436014533
View all IBM x3655 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 79 highlights
SATA tape drive signal connector SATA tape cable 8. Install the air baffle (see "Installing the air baffle" on page 42). 9. Install the riser-card assembly, if you removed it to install a SATA drive (see "Installing the riser-card assembly" on page 85). 10. Install the fan-bracket assembly (see ″Installing the fan-bracket assembly″ on page 114). 11. Install the cover (see ″Installing the server cover″ page 88). 12. Slide the server into the rack. 13. Connect the cables and power cords. 14. Turn on all attached devices and the server. Chapter 3. Removing and replacing server components 61
![](/manual_guide/products/ibm-x3655-service-guide-079be7e/79.png)
SATA tape
drive signal
connector
SATA tape
cable
8.
Install
the
air
baffle
(see
“Installing
the
air
baffle”
on
page
42).
9.
Install
the
riser-card
assembly,
if
you
removed
it
to
install
a
SATA
drive
(see
“Installing
the
riser-card
assembly”
on
page
85).
10.
Install
the
fan-bracket
assembly
(see
″
Installing
the
fan-bracket
assembly
″
on
page
114).
11.
Install
the
cover
(see
″
Installing
the
server
cover
″
page
88).
12.
Slide
the
server
into
the
rack.
13.
Connect
the
cables
and
power
cords.
14.
Turn
on
all
attached
devices
and
the
server.
Chapter
3.
Removing
and
replacing
server
components
61