HP ML370 HP ProLiant ML370 Generation 3 Setup and Installation Guide - Page 11
Pressing the Power On/Standby button, Server cables secured to the cable management arm
UPC - 613326765616
View all HP ML370 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Contents 3-59 Installing a hot-plug power supply 3-69 3-60 Using a management clip to secure the power cord 3-70 3-61 PCI-X expansion slots (tower server 3-71 3-62 Removing an expansion slot cover 3-74 3-63 Releasing the PCI-X guide clip 3-75 3-64 Installing an expansion board 3-76 3-65 Securing the PCI-X guide clip 3-77 4-1 Server installed in the rack 4-2 4-2 Measuring with the template on the front of the rack 4-4 4-3 Inserting cage nuts ...4-6 4-4 Attaching a server rail to the chassis 4-7 4-5 Inserting the spring-load rails into the front of the rack 4-8 4-6 Inserting the spring-load rails into the rear of the rack 4-9 4-7 Lifting with the server handles 4-10 4-8 Aligning the server rails with the rack rails and inserting the server 4-11 4-9 Initializing the rail locks 4-12 4-10 Tightening the thumbscrews 4-12 4-11 Securing the cable management arm to the server 4-13 4-12 Securing the cable management arm to the rack 4-14 4-13 Releasing the power cord retaining clip 4-15 4-14 Securing the power cord in the retaining clip 4-16 4-15 Server cables secured to the cable management arm 4-17 4-16 Pressing the Power On/Standby button 4-18 4-17 Inserting the CD into the rack server 4-20 4-18 Extending the server from the rack 4-23 4-19 Unlocking the cable management arm 4-24 4-20 Cable management arm fully open 4-25 5-1 Tower server ...5-2 5-2 Pressing the Power On/Standby button 5-4 5-3 Inserting the CD into the tower server 5-6 6-1 Cabling the SCSI hard drive cage to SCSI port 1 (center wall and PPMs removed for clarity 6-2 6-2 Cabling the diskette drive to the system board 6-3 6-3 Cabling the CD-ROM drive to the system board (rack server 6-4 6-4 Cabling an internal tape drive to SCSI port 2 6-5 6-5 Disconnecting the primary SCSI cable 6-6 6-6 Connecting the SCSI cable to the SCSI controller option 6-7 6-7 Cabling an optional internal two-bay hot-plug SCSI drive cage 6-8 6-8 Cabling hot-plug fans to the fan connector on the system board 6-9 HP ProLiant ML370 Generation 3 Server Setup and Installation Guide xi