HP ML370 HP ProLiant ML370 Generation 3 Setup and Installation Guide - Page 142
Table 4-1, Front Panel LED Activity During the Power-Up, Sequence, HP ROM-Based Setup Utility User
UPC - 613326765616
View all HP ML370 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 142 highlights
Installing the Rack Server 3. Observe the front panel LEDs for a successful power-up sequence. Table 4-1 describes a successful power-up sequence. Table 4-1: Front Panel LED Activity During the Power-Up Sequence Item Description Power On/Standby LED From amber to green Internal health LED From off to green External health LED From off to green NIC LED From off to green (when linked to the network) From off to flashing green for network activity Note: For a detailed explanation of all system LEDs, refer to Appendix E, "LED Indicators and Switches." When the server powers on for the first time, the server performs a POST and launches RBSU. After selecting initial system settings, install the operating system and perform additional configuration tasks. For additional information about configuring the server with RBSU, refer to the HP ROM-Based Setup Utility User Guide. HP ProLiant ML370 Generation 3 Server Setup and Installation Guide 4-19