HP ML370 HP ProLiant ML370 Generation 3 Setup and Installation Guide - Page 129
Installing Server Rails
UPC - 613326765616
View all HP ML370 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 129 highlights
Installing the Rack Server To install the cage nuts: 1. Position one of the cage nuts on the inside of a vertical rail on the front of the rack. 2. Compress the sides of the cage nut and insert both lips into the square cutout on the rail. NOTE: Use a fitting tool as an aid to help install the cage nuts, if needed. Figure 4-3: Inserting cage nuts 3. Repeat steps 1 and 2 for a second cage nut. Installing Server Rails To install the server rails on the server: IMPORTANT: Install the server rails with the smooth side of the rail against the server chassis. 1. Align the four keyholes on one of the server rails with the four spools on the side of the chassis. The closed, tapered end of the rail points toward the rear panel of the server. 4-6 HP ProLiant ML370 Generation 3 Server Setup and Installation Guide