HP ML370 HP ProLiant ML370 Generation 3 Setup and Installation Guide - Page 131

Grasp the far end of the spring-load assembly with your other hand and pull

Page 131 highlights

Installing the Rack Server 2. Insert the rail tabs from the spring-loaded end of the assembly into the marked holes on the interior of the vertical rails on the front of the rack (1). IMPORTANT: The smooth side of the spring-load rail assembly must face the outside of the rack. 3. Grasp the spring-load rail assembly and squeeze the two spring release tabs in toward the rail to unlock the spring mechanism (2). 4. Grasp the far end of the spring-load assembly with your other hand and pull the rail in toward you until the rack tabs on the fixed end of the assembly clear the interior side of the rear vertical rack rail (3). Figure 4-5: Inserting the spring-load rails into the front of the rack 4-8 HP ProLiant ML370 Generation 3 Server Setup and Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263

Installing the Rack Server
4-8
HP ProLiant ML370 Generation 3 Server Setup and Installation Guide
2.
Insert the rail tabs from the spring-loaded end of the assembly into the marked
holes on the interior of the vertical rails on the front of the rack (1).
IMPORTANT:
The smooth side of the spring-load rail assembly must face the outside of
the rack.
3.
Grasp the spring-load rail assembly and squeeze the two spring release tabs in
toward the rail to unlock the spring mechanism (2).
4.
Grasp the far end of the spring-load assembly with your other hand and pull the
rail in toward you until the rack tabs on the fixed end of the assembly clear the
interior side of the rear vertical rack rail (3).
Figure 4-5:
Inserting the spring-load rails into the front
of the rack