Symantec 10521148 Implementation Guide - Page 62

Powering the 7120 on or off, Powering the 7120 off before initial configuration

Page 62 highlights

54 Installing the 7100 Series Cabling 6 If the USB cable is not yet connected, plug one USB connector into either USB port on the 7120 appliance, and plug the other connector into the Mgmt USB port on the 2 In-line Bypass unit. Powering the 7120 on or off As the last step in the physical installation of the 7120 appliance, connect and turn on the power. When the appliance powers on, you should hear the hard drive spin up and the fans turn on, and see the LEDs and LCD screen light up. An uninterruptible power supply (UPS) is recommended. Do not use an extension cord. To power the 7120 on for the first time ◆ Connect one end of the power cord to the AC power socket on the appliance, and plug the other end into the power source. The 7120 powers up automatically. Powering the 7120 off before initial configuration If you need to power the 7120 off before performing initial configuration, you can use the master power switch or the Shutdown Host option on the LCD. After initial configuration, you should power the appliance off by using the LCD menu item or a command on the serial console. See "Powering off the appliance" on page 152. To power the 7120 off before initial configuration ◆ Do one of the following: ■ On the LCD panel, use the buttons to navigate to the Shutdown Host option on the LCD screen and press e. ■ On the back panel of the 7120, press and hold the master power switch for approximately 5 seconds until you hear the fans stop. Cabling for model 7160 This section describes cabling for model 7160. If you have a different model, refer to the appropriate section. See "Cabling for model 7120" on page 49. See "Cabling for model 7161" on page 62. The following topics are covered here: ■ Connecting the management, reset, and serial ports

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214

54
Installing the 7100 Series
Cabling
6
If the USB cable is not yet connected, plug one USB connector into either
USB port on the 7120 appliance, and plug the other connector into the
Mgmt USB port on the 2 In-line Bypass unit.
Powering the 7120 on or off
As the last step in the physical installation of the 7120 appliance, connect and
turn on the power. When the appliance powers on, you should hear the hard
drive spin up and the fans turn on, and see the LEDs and LCD screen light up.
An uninterruptible power supply (UPS) is recommended. Do not use an
extension cord.
To power the 7120 on for the first time
Connect one end of the power cord to the AC power socket on the appliance,
and plug the other end into the power source.
The 7120 powers up automatically.
Powering the 7120 off before initial configuration
If you need to power the 7120 off before performing initial configuration, you
can use the master power switch or the Shutdown Host option on the LCD. After
initial configuration, you should power the appliance off by using the LCD menu
item or a command on the serial console.
See
“Powering off the appliance”
on page 152.
To power the 7120 off before initial configuration
Do one of the following:
On the LCD panel, use the buttons to navigate to the
Shutdown Host
option on the LCD screen and press
e
.
On the back panel of the 7120, press and hold the master power switch
for approximately 5 seconds until you hear the fans stop.
Cabling for model 7160
This section describes cabling for model 7160. If you have a different model,
refer to the appropriate section.
See
“Cabling for model 7120”
on page 49.
See
“Cabling for model 7161”
on page 62.
The following topics are covered here:
Connecting the management, reset, and serial ports