Dell PowerConnect B-RX16 Installation Guide - Page 41

Preparing the installation site, Unpacking a BigIron RX-4 switch, Cabling infrastructure

Page 41 highlights

Installing a BigIron RX-4 switch 2 • "Installing a BigIron RX-4 chassis in a rack" • "Installing BigIron RX-4 modules" • "Installing power supplies in a BigIron RX-4 chassis" • "Connecting AC power to a BigIron RX-4 chassis" • "Connecting DC power to a BigIron RX-4 chassis" • "Final steps" Preparing the installation site Cabling infrastructure Ensure that the proper cabling is installed in the site. For information on cabling, refer to "Installing power supplies in a BigIron RX-4 chassis" on page 35, "Attaching a management station" on page 77, and "Connecting a BigIron RX Series switch" on page 105. Installation location Before installing the switch, plan its location and orientation relative to other devices and equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front, and the back of the chassis and walls or other obstructions. If a chassis is installed within a perforated enclosure, the perforations must have openings of at least 60 percent of the surface. Unpacking a BigIron RX-4 switch The BigIron RX-4 switch ships with several items. Review the list below, and verify the contents. If any items are missing, contact the place of purchase: • BigIron RX-4 chassis with the appropriate number of switch fabric modules already installed in the slot marked SF and a slot blank installed in all other module slots. NOTE You must provide standard #12-24 pan-head screws for mounting the BigIron RX-4 chassis into a rack. • CD-ROM containing software images and the user documentation (including this guide). • Warranty card. • A 115V AC power cable for each AC power supply you purchase from Brocade. Follow the steps given below to unpack a BigIron RX-4 chassis. 1. Move the pallet to a staging area as close to the installation site as possible. 2. Position the shipping carton with the arrows pointing up. 3. Remove the strap that secures the shipping carton to the pallet. 4. Remove the plastic cover and shipping carton. 5. Save the shipping carton, pallet, and packing materials in case you need to move or ship the chassis at a later time. BigIron RX Installation Guide 29 53-1001811-01

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240

BigIron RX Installation Guide
29
53-1001811-01
Installing a BigIron RX-4 switch
2
“Installing a BigIron RX-4 chassis in a rack”
“Installing BigIron RX-4 modules”
“Installing power supplies in a BigIron RX-4 chassis”
“Connecting AC power to a BigIron RX-4 chassis”
“Connecting DC power to a BigIron RX-4 chassis”
“Final steps”
Preparing the installation site
Cabling infrastructure
Ensure that the proper cabling is installed in the site.
For information on cabling, refer to
“Installing power supplies in a BigIron RX-4 chassis”
on
page 35,
“Attaching a management station”
on page 77, and
“Connecting a BigIron RX Series
switch”
on page 105.
Installation location
Before installing the switch, plan its location and orientation relative to other devices and
equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front,
and the back of the chassis and walls or other obstructions. If a chassis is installed within a
perforated enclosure, the perforations must have openings of at least 60 percent of the surface.
Unpacking a BigIron RX-4 switch
The BigIron RX-4 switch ships with several items. Review the list below, and verify the contents. If
any items are missing, contact the place of purchase:
BigIron RX-4 chassis with the appropriate number of switch fabric modules already installed in
the slot marked SF and a slot blank installed in all other module slots.
NOTE
You must provide standard #12-24 pan-head screws for mounting the BigIron RX-4 chassis into a
rack.
CD-ROM containing software images and the user documentation (including this guide).
Warranty card.
A 115V AC power cable for each AC power supply you purchase from Brocade.
Follow the steps given below to unpack a BigIron RX-4 chassis.
1.
Move the pallet to a staging area as close to the installation site as possible.
2.
Position the shipping carton with the arrows pointing up.
3.
Remove the strap that secures the shipping carton to the pallet.
4.
Remove the plastic cover and shipping carton.
5.
Save the shipping carton, pallet, and packing materials in case you need to move or ship the
chassis at a later time.