IBM 6000R Hardware Maintenance Manual - Page 103
Completing the installation, Installing the server top cover and bezel
UPC - 087944534341
View all IBM 6000R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 103 highlights
Completing the installation To complete the installation, you must reinstall the top cover, reinstall the bezel, reconnect all cables that you disconnected, and, for certain options, run the Configuration/Setup Utility program. Follow the instructions in this section. Attention: For correct cooling and airflow, install the top cover before turning on the server. Operating the server for extended periods of time (over 30 minutes) with the top cover removed might damage server components. To complete the installation, you must reinstall the top cover, reinstall the media-bay bezel, reconnect all the cables that you disconnected earlier and, for certain options, run the Configuration/Setup Utility program. Follow the instructions in this section. Attention: For correct cooling and airflow, install the top cover before turning on the server. Operating the server for extended periods of time (over 30 minutes) with the top cover removed might damage server components. Note: If you have just plugged the power cords of the server into an electrical outlet, you will have to wait approximately 20 seconds before pressing the power-control button. Installing the server top cover and bezel The following illustration shows how install the server top cover. Note: The illustrations in this document might differ slightly from your hardware. 1 Top cover 2 Right release latch 3 Bezel 4 Left release latch 5 Cover release latch Installing options 91