HP LaserJet 9040/9050 Service Manual - Page 88

Theory of operation, Table 15., Failure sequence of operation, State, Period, Operation

Page 88 highlights

Table 14. Normal sequence of operation (continued) State Period Operation INTR (initial rotation) PRINT LSTR (last rotation) From the input of a print- z reservation command from the z formatter until the laser/scanner z enters a ready state z z z z z z z z From the input of a print z command until the primary dc z bias is turned off z z z z z z z From the time the primary z charging roller is turned off until z each of the motors stops z z z z z scanner-motor rotation fuser/delivery-motor rotation drum-motor rotation high-voltage control (negative bias to transfer roller) receives print command fan-motors 1 through 6 full-speed rotation pickup operation starts high-voltage control bias applied to primary charging roller, developing roller, and transfer roller) fuser control (fuser roller to 190°C [374 °F], pressure roller 180°C [356°F]) initial rotation final check (high-voltage, scanner motor, pickup operation complete) jam/door open/failure/sleep check fuser/delivery, drum, scanner, and fan-motor rotations fuser control (print temperature-fuser 190°C [374°F]) engine-to-formatter output signal formatter-to-engine input signal paper-feed control image control high-voltage control (toner level-output separation bias and pressure roller bias) next-pickup control (calculates, from media size, the speed to send media through) jam/door open/failure fuser/delivery, drum, scanner, and fan motor rotations high-voltage control completion fuser control (print to standby temperature-180°C [356°F]) fan motor control (fan 1 through 6 full-speed rotation) fuser/delivery, drum, and scanner motor stop (writes in cartridge memory) jam/door open/failure check ready for next pickup Table 15. Failure sequence of operation State Period Operation JAM From the time the power is z sensor check switched on until the end of the z drive stop (scanner motor, high-voltage, fuser control, and LSTR period fuser/delivery motor stop) z status setting (jam status set) z door open check DOOR OPEN From the time the power is z switched on until the end of the z LSTR period z drive stop status setting door close (wait sequence) FAILURE From the time the power is z drive stop switched on until the end of the z status setting (set) LSTR period 72 Chapter 5 Theory of operation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330
  • 331
  • 332

72
Chapter 5 Theory of operation
INTR
(initial
rotation)
From the input of a print-
reservation command from the
formatter until the laser/scanner
enters a ready state
scanner-motor rotation
fuser/delivery-motor rotation
drum-motor rotation
high-voltage control (negative bias to transfer roller)
receives print command
fan-motors 1 through 6 full-speed rotation
pickup operation starts
high-voltage control bias applied to primary charging roller,
developing roller, and transfer roller)
fuser control (fuser roller to 190°C [374 °F], pressure roller
180°C [356°F])
initial rotation final check (high-voltage, scanner motor, pickup
operation complete)
jam/door open/failure/sleep check
PRINT
From the input of a print
command until the primary dc
bias is turned off
fuser/delivery, drum, scanner, and fan-motor rotations
fuser control (print temperature—fuser 190°C [374°F])
engine-to-formatter output signal
formatter-to-engine input signal
paper-feed control
image control
high-voltage control (toner level-output separation bias and
pressure roller bias)
next-pickup control (calculates, from media size, the speed to
send media through)
jam/door open/failure
LSTR
(last
rotation)
From the time the primary
charging roller is turned off until
each of the motors stops
fuser/delivery, drum, scanner, and fan motor rotations
high-voltage control completion
fuser control (print to standby temperature—180°C [356°F])
fan motor control (fan 1 through 6 full-speed rotation)
fuser/delivery, drum, and scanner motor stop (writes in
cartridge memory)
jam/door open/failure check
ready for next pickup
Table 15.
Failure sequence of operation
State
Period
Operation
JAM
From the time the power is
switched on until the end of the
LSTR period
sensor check
drive stop (scanner motor, high-voltage, fuser control, and
fuser/delivery motor stop)
status setting (jam status set)
door open check
DOOR
OPEN
From the time the power is
switched on until the end of the
LSTR period
drive stop
status setting
door close (wait sequence)
FAILURE
From the time the power is
switched on until the end of the
LSTR period
drive stop
status setting (set)
Table 14.
Normal sequence of operation (continued)
State
Period
Operation