ASRock Z87 Extreme11/ac LSI Mega RAID Storage Manager Guide - Page 88

Group Show Progress Window, Abort, Abort All, Close

Page 88 highlights

Figure 70 Group Show Progress Window The Group Show Progress window displays a percent-complete indicator for drive rebuilds. Rebuilds may take a long time to complete and cannot be aborted. An up-arrow appears above the drive icon while it is being rebuilt. Operations on virtual drives appear in the left panel of the window, and operations on drives appear in the right panel. The type of operations that appear in this window are as follows: • Initialization of a virtual drive (see Initializing a Virtual Drive) • Rebuild (see Rebuilding a Drive) • Consistency check (see Running a Consistency Check) A Modify Drive Group process cannot be aborted. To abort any other ongoing process, click the Abort button next to the status indicator. Click Abort All to abort all ongoing processes. Click Close to close the window. Page 88 DB09-000202-05 37857-02 Monitoring Controllers and Its Attached Devices Rev. F - May 2011 Copyright © 2011 by LSI Corporation. All rights reserved.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178

Page 88
Monitoring Controllers and Its Attached Devices
DB09-000202-05 37857-02
Rev. F - May 2011
Copyright © 2011 by LSI Corporation. All rights reserved.
Figure 70
Group Show Progress Window
The Group Show Progress window displays a percent-complete indicator for drive rebuilds.
Rebuilds may take a long time to complete and cannot be aborted. An up-arrow appears above
the drive icon while it is being rebuilt.
Operations on virtual drives appear in the left panel of the window, and operations on drives
appear in the right panel. The type of operations that appear in this window are as follows:
Initialization of a virtual drive (see
Initializing a Virtual Drive
)
Rebuild (see
Rebuilding a Drive
)
Consistency check (see
Running a Consistency Check
)
A Modify Drive Group process cannot be aborted. To abort any other ongoing process, click the
Abort
button next to the status indicator. Click
Abort All
to abort all ongoing processes. Click
Close
to close the window.