Cisco IPS-4255-K9 Installation Guide - Page 65
Step 1, Step 2, Step 3, Step 4, Step 5, Step 6, Step 7
UPC - 746320951096
View all Cisco IPS-4255-K9 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 65 highlights
Chapter 2 Installing the IPS 4240 and the IPS 4255 To install the IPS 4240-DC, follow these steps: Step 1 Position the IPS 4240-DC on the network. Step 2 Attach the grounding lug to the side of the appliance. Cisco IPSIn4tru2s4io0n Psreevrieenstion Sensor Installing the IPS 4240-DC 148406 Note Use 8-32 screws to connect a copper standard barrel grounding lug to the holes. The appliance requires a lug where the distance between the center of each hole is 0.56 inches. The ground lug must be NRTL listed or recognized. In addition, the copper conductor (wires) must be used and the copper conductor must comply with the NEC code for ampacity. A lug is not supplied with the appliance. Step 3 Step 4 Step 5 Step 6 Step 7 Place the appliance in a rack, if you are rack mounting it. Terminate the DC input wiring on a DC source capable of supplying at least 15 amps. A 15-amp circuit breaker is required at the 48-VDC facility power source. An easily accessible disconnect device should be incorporated into the facility wiring. Locate the DC-input terminal box. Power off the IPS 4240-DC. Make sure that power is removed from the DC circuit. To make sure all power is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the OFF position. Remove the DC power supply plastic shield. OL-18504-01 Cisco Intrusion Prevention System Appliance and Module Installation Guide for IPS 7.0 2-11