Netgear XCM8806 Chassis Hardware Installation Guide - Page 124
show power controller, Description, Command Syntax, Default, Usage Guidelines
View all Netgear XCM8806 Chassis manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 124 highlights
NETGEAR 8800 Chassis Switch CLI Manual Power Allocated: 713.00 Power Surplus: 535.00 Redundant Power Supply(s) Present?: NO show power controller show power controller {} Description Displays the current status of the installed power supply controllers. Command Syntax num Specifies the slot number of the installed power supply controller. Default N/A. Usage Guidelines Use this command to view detailed information about the health of the power supply controllers. Power controllers collect data about the installed power supplies and report the results to the MSM/MM. This status information may be useful for your technical support representative if you have a network problem. The switch collects the following power supply controller information: • State-Indicates the current state of the power supply controller. Options are: • Empty: There is no power supply controller installed. • Operational: The power supply controller is installed and operational. • Present: The power supply controller is installed. • PartInfo-Provides information about the power supply controller including the: • Slot number where the power supply controller is installed. • Serial number, a collection of numbers and letters, that make up the serial number of the power supply controller. • Part number, a collection of numbers and letters that make up the part number of the power supply controller. • Revision-Displays the revision number of the power supply controller. • FailureCode-Specifies the failure code of the power supply controller. • Odometer-Specifies the date and how long the power supply controller has been operating. 124 | Chapter 3. Commands for Managing the Switch