Sony XVS-7000 Users Guide - Page 209
Frame Memory Operations, Frame memory data
View all Sony XVS-7000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 209 highlights
To check the assignment status details of each resource, press [Detail] in the Resource Share menu (7312.1) to display the Detail menu (7312.2). The details for the resource selected in the upper list in the status area are displayed. Setup menu operation [SWR1] displayed in the Setup menu refers to logical switcher 1, and [SWR2] refers to logical switcher 2. These can be configured in the same way as the physical switcher. The resource numbers for the logical switchers and physical switcher are also displayed in the input/output display in the following menus. • Engineering Setup >Switcher >Input menu (7332) • Engineering Setup >Switcher >Output menu (7333) • Engineering Setup >Switcher >Output >Output Assign menu (7333.1) However, only physical switcher resource numbers are displayed for XVS-9000 outputs 81 to 96 (multi viewer outputs 1 to 16). Notes • Changing the signal format in the Engineering Setup >System >Format menu (7313) may also change the setting of the other logical switcher. - If the combination of signal formats that would result from changing signal format is not supported for resource sharing, the other logical switcher is set to the same format as the currently selected logical switcher, and reboots. - If the field frequency/frame frequency is changed, the other logical switcher also changes in conjunction with the currently selected logical switcher, and reboots. - If the input reference signal is changed, the other logical switcher also changes in conjunction with the currently selected logical switcher. • The Engineering Setup >System >Start Up menu (7314) [Resume FM Status] and [Init Status with FM] settings are disabled. • Executing [Reset] in the Engineering Setup >System >Initialize menu (7315) will reset both logical switchers 1 and 2, regardless of which logical switcher is currently selected. Executing [All Clear] will initialize the currently selected logical switcher and reset the other logical switcher. • When installing software using the Engineering Setup >System >Install/Unit Config >Install menu (7316.10), the other logical switcher cannot be operated. • The following menus can be configured only from logical switcher 1. All inputs and outputs are the target of settings, regardless of the resource assignments. - Engineering Setup >System >Network Config >Net I/F Initialize menu (7311.1) - Engineering Setup >System >Network Config >IP Address menu (7311.2) - Engineering Setup >System >Network Config >Net I/F Protocol menu (7311.3) - Engineering Setup >System >Network Config >FEC menu (7311.4) - Engineering Setup >System >Network Config >Input/ Output menu (7311.5) - Engineering Setup >System >Network Config >Genlock menu (7311.6) - Engineering Setup >System >Network Config >NMOS menu (7311.7) - Engineering Setup >System >Maintenance >SDI Output Enable menu (7317.3) • The reference phase (System Phase) setting in the Engineering Setup >Switcher >Config menu (7331) is common to logical switchers 1 and 2. • Setup menu operation for shared resources is available from logical switcher 1 only. However, Engineering Setup >Panel >Xpt Assign >Src Name/Src Color menu (7322.6) independent operation for shared resources is available on logical switchers 1 and 2. Frame Memory Operations Frame memory data The image data (folders/files) that can be used by each logical switcher varies depending on the frame memory folder mode setting. Shared mode All frame memory data is shared between logical switchers 1 and 2. All folders and files are displayed as the target for operations in the menu for each logical switcher. Notes • When the signal formats of logical switchers 1 and 2 are different and Dual Simul mode is enabled, shared mode cannot be used. • When an FM output is locked on either logical switcher, file operations on the file loaded in the locked FM output are not available from the other logical switcher. • The following operations are available on either logical switcher for a file loaded in an FM output on the other logical switcher. Copy, move, delete, rename, Couple function, Separate function, trim, and unload (remove from memory) • The folder lock/unlock settings are linked on logical switchers 1 and 2. Dedicated mode When a switcher is started with resource sharing enabled, dedicated folders with the following names are created for each logical switcher. • Logical switcher 1: !L_SWR1 209